Building a home from scratch, or knocking down an old one to build new, is an exciting path to exactly the property you want. But the finance works quite differently from buying an established home. Here is a plain-English guide to construction loans: what they are, how the drawdown process works and what to watch out for.
What is a construction loan?
A construction loan is a type of home loan specifically designed for people building a new property. Unlike a standard home loan (where the full amount is advanced at settlement), a construction loan releases funds progressively as building work is completed. This is called a progressive drawdown (or progress payment) structure.
At the end of the construction period, the loan typically converts to a standard home loan (variable or fixed, P&I or IO, as you choose).
How do progressive drawdowns work?
The construction contract between you and your builder divides the build into stages. At each stage, the builder invoices you, and you request a drawdown from your lender. The lender may send a valuer to confirm the stage is complete before releasing the funds.
Typical construction stages (these vary by builder and contract):
| Stage | Approximate drawdown |
|---|---|
| Slab (base) laid | 10% to 15% of build cost |
| Frame complete | 15% to 20% |
| Lock-up (roof, external walls, doors, windows) | 20% |
| Fixing (internal plasterboard, fit-out) | 20% |
| Practical completion | Remaining balance |
The percentages are set by your building contract and confirmed with the lender upfront.
Interest during construction
During the construction phase, you typically pay interest only on the amount that has been drawn down so far, not on the full loan amount. This keeps your repayments lower while the build is in progress.
A worked example: You are building a $500,000 home (construction cost) and have drawn down $100,000 for the slab stage. At 6.50% (IO), your monthly interest payment is approximately $552 per month at that stage. As more stages are drawn down, the interest amount increases accordingly.
Once construction is complete and the loan converts to a standard loan, you move to your agreed repayment structure (typically P&I). This is an important transition: repayments increase significantly at this point because you are now paying principal and interest on the full loan amount. Planning for this higher repayment from the outset avoids a surprise when the build wraps up.
The land purchase
If you are buying a house and land package or a block to build on, the land purchase happens separately, usually settled in full at the time of purchase. This is funded by the first drawdown of your construction loan or by a separate land loan that merges with the construction loan. Your broker will structure this correctly.
What about house and land packages?
A house and land package bundles the land purchase with a fixed-price building contract. The land settles first (with the land portion of the loan), and then the construction loan kicks in for the build. These packages can be an efficient way to get into a new property, particularly for investors or buyers in growth corridors.
Key things to have in place before a construction loan
A fixed-price building contract
Lenders require a signed, council-approved building contract with a fixed price. “Cost-plus” contracts (where the builder charges cost plus a margin) are generally not accepted by lenders.
Council-approved plans
Building approval from your local council (or certifier) is required before the lender will formally approve the construction loan. Local requirements, like a Complying Development Certificate (CDC) or Development Application (DA), must be provided.
Builder’s insurance
Your builder must have current home indemnity (home warranty) insurance and public liability insurance. The lender will check this.
Valuation of completed property
The lender will commission a valuation of what the completed property is expected to be worth (“as if complete” valuation) to confirm the loan amount is appropriate relative to the finished value.
Construction loan LVR
Construction loans are assessed on the total project cost (land plus build) relative to the estimated completed value. Most lenders lend up to 80% to 90% LVR on construction loans. LMI typically applies above 80%.
Rates and deposit requirements on construction loans
Construction loans often carry higher interest rates and fees than standard residential mortgages. This is because the lender is funding an asset that does not yet exist as security. The lender cannot take the same comfort from a fully built and valued property, so they price the additional risk into the loan. Construction loans can require a larger deposit, often in the 10% to 20% range of the total project cost (land plus build), however this does depend on the lender and your circumstances.
What if costs overrun?
Fixed-price contracts protect you from most cost increases, as the builder carries the risk. However, there is an important nuance: even with a fixed-price building contract, overruns can and do occur through variations (changes you request), weather delays, materials shortages or other unforeseen factors. These additional costs come from your own funds, not from an automatic increase to the loan. Lenders will not simply top up the construction loan mid-build because costs have risen.
This is why it is sensible to hold a contingency buffer (commonly 5% to 10% of the build cost) in your own savings alongside the loan, separate from the loan itself, for unexpected items not covered by the contract. A fixed-price contract does not guarantee that your total out-of-pocket cost will be exactly what was quoted.
Frequently asked questions
-
Yes, subject to the price cap for your location. The total of the land price plus building contract must fall within the relevant First Home Guarantee price cap. Check the caps on our grants and schemes page.
-
It varies by build type and complexity. A standard house build is typically between 6 to 24 months from slab to completion. Delays can occur due to weather, material supply or trades availability. Your loan approval is typically valid for a set period; your broker will confirm this.
-
Contact your lender and broker as soon as possible. Most lenders can extend approval periods for construction loans if there are legitimate delays. Communication is key.
-
During the construction phase, you pay interest only on the amount drawn down. Full P&I (or IO) repayments begin once the loan converts after practical completion.
-
Some lenders do offer owner-builder loans, but they have stricter requirements (typically an owner-builder licence, experience in construction and often a lower maximum LVR). Not all lenders offer them. Talk to your broker about your options.
Chat with our team or visit our construction loans page to get started. Building is a big undertaking and having the right finance structure from day one makes a real difference.
This page provides general information only and does not constitute credit, financial, legal or tax advice. Your full financial situation will need to be reviewed prior to acceptance of any offer or product. Credit Representative Number 494872 is authorised under Australian Credit License Number 389328.